POWER STEERING ECU (for Sedan) > INSTALLATION



1. INSTALL POWER STEERING ECU


    C118008
  1. Install the power steering ECU with the 2 nuts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


    C117190
  1. Connect the 4 connectors.



    C117191
  1. Install the wire harness clamp.

    NOTICE:
    Make sure that the wire harness of the steering column assembly is installed onto the power steering ECU bracket and that it is not pulled too tightly.


2. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY


B130309E01
  1. Using a nipper, cut off both ends of the runner portion shown in the illustration (When installing a new one).

  1. Engage the 5 claws at the front side of the instrument panel.



  1. Engage the 7 clips at the rear side of the instrument panel.


    B132324



  1. Install the upper instrument panel with the 2 <C> bolts and the 2 <B> screws.


    B132323E01

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf } for bolt <C>


    B132386
  1. Connect the passenger airbag connector and clamp.



3. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY


B132321E01
  1. Engage the claws of the hinge portions by pushing the glove compartment door in the horizontal direction to install the glove compartment door assembly.

    NOTICE:
    Engage the claw by pushing it in the horizontal direction, otherwise, installation failure caused by excessive play around the hinge portion will result.


    B132319E01
  1. Slightly flex the upper portion of the glove compartment door assembly to engage the stopper.

  1. Install the 2 glove compartment door stoppers onto the glove compartment door.



4. INSTALL FRONT PILLAR GARNISH RH


    B134787
  1. Install the 3 clamps.

  1. Connect the antenna connector.



    B134779
  1. Engage the 2 clips and the 2 claws and install the front pillar garnish.



5. INSTALL FRONT PILLAR GARNISH LH


    B134789
  1. Install the 4 clamps.



    B134780
  1. Engage the 2 clips and the 2 claws and install the front pillar garnish.



6. INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP RH


    B134766E01
  1. Align the location mark with the paint mark first, and install the front door opening trim weatherstrip, as shown in the illustration.

    Paint mark:
    Area
    Color
    RH side
    Blue
    LH side
    Pink


7. INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP LH

HINT:
Use the same procedure as for the RH side.


8. INSTALL COMBINATION METER ASSEMBLY


E116835E01
  1. Install the combination meter assembly with the 2 screws.

    NOTICE:
    Install the meter by inserting the ribbed portions of the meter between the instrument panel and meter cluster.
  1. Connect the 2 connectors.



9. INSTALL INSTRUMENT CLUSTER FINISH PANEL NO.1


E116833
  1. Fit the 2 claws of the instrument cluster finish panel into the upper instrument cluster finish panel center.



    E116834
  1. Engage the 5 claws and 5 clips and install the instrument cluster finish panel.



10. INSTALL INSTRUMENT PANEL FINISH PANEL END RH


B132318
  1. Engage the 6 claws and 3 clips and install the instrument panel finish panel end RH.



11. INSTALL INSTRUMENT PANEL FINISH PANEL END LH


B132317
  1. Engage the 6 claws and 3 clips and install the instrument panel finish panel end LH.



12. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER CENTER


B132316
  1. Engage the 2 claws and 2 clips and install the instrument panel finish panel.



13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }


14. CHECK SRS WARNING LIGHT
(Click here)


15. PERFORM ZERO POINT CALIBRATION
(Click here)